Royal Dramatic Theatre
Sweden
Stockholm
 ©Waagner-Biro Stage Systems
©Waagner-Biro Stage Systems80+
Number of Machinery
1
Number of Venues
2021
Year of Completion
7
Duration of Project (in Months)
Facts and Figures
The installation was completed in a very short phase of 6-7 months, with more than 50 axes successfully integrated into the control system.
Type of venue
 ©Waagner-Biro Stage Systems
©Waagner-Biro Stage SystemsThe Royal Dramatic Theatre, Sweden's national stage for spoken theater, was founded in 1788 and has been located in the Art Nouveau building on Nybroplan since 1908.
Waagner-Biro Stage Systems was awarded the contract to renovate the upper stage machinery of the 720-seat main stage. As part of this project, all new and existing equipment was integrated into the innovative C⋅A⋅T-V5 control system. The successful handover took place in July 2021.
This renovation makes the Royal Dramatic Theatre the third location in Stockholm with a C⋅A⋅T V5 control system, alongside the Royal Opera House and Stockholm City The installation was completed in a very short phase of 6-7 months, with more than 50 axes successfully integrated into the control system. 
3x Stockholm by Waagner-Biro Stage Systems